Menu
Trenchless Solutions for Oil and Gas, Municipal and Utility Infrastructure
Cabre Highlight Projects
Auger Bore / DTH / Pipe Ram Services
Macro Projects
Project:
Trans Mountain Expansion Project
Product:
36"-48" pipe, 700m+ installed
ABM and DTH installation methods
ConocoPhillips
Project:
Cameron River Crossing Project
Product:
12", 16" and 24" Conductor Barrels
Installation with Pipe Ram/ABM
S. Young Enterprises
Project:
Capital Roadworks 2020 Project
Product:
Guided 30" Casing install
Installation with Air Hammer/Pipe Ram
HDD Services
Strike Energy Group
Project:
Husky Oil Operations Ltd. Grande Prairie, AB (14-28-62-06 W6)
Product:
6” YJ2K
361m (First 300m solid rock) Double Creek Crossing
Pembina Pipeline
Project:
Encana North Central Liquids Hub ( Farmington, BC)
Product:
10” Steel
1644 Meters Pulled, Lengths Vary, Crossing Types Varied
Two Designed Crossings, 248m Road and 249m Wetland
Project:
NPS 10 Swan Hills Replacement Pipeline (Swan Hills, AB)
Product:
10” Steel
813m (+30m deep) Creek and Hotline Crossing
357m (+30m deep) Freeman River Crossing
Project:
Canbriam Nevis Expansion (Wonowon, BC)
Product:
6” Steel
414m (+30m deep) Cameron River Crossing
Black Swan Energy
Project
:
North Aitken C-38-C (Tommy Lakes area, BC)
Product:
6", 12", 16" pipe
1637 Meters Pulled. Designed Creek Crossings.
Tourmaline
Project:
Sundance Field Pipeline Project
Product:
6" Steel Multiple Creek Crossing, 200-400m
Project:
Cameron River Project
Product:
12" Steel Parallel 500m River Crossing
Project:
Gundy Gas Plant (North of Fort St. John, BC)
Product:
8" YJ2K and 20" FBE
1989 Meters Pulled. Extreme hard ground conditions.
Macro
Project:
Spectra – Dead Horse Creek (Kobes, BC)
Product:
12” YJ320m (+30m deep) Creek Crossing
320m (+30m deep) Creek Crossing
Project:
Seven Generations Nest 3 Project (South of Grande Prairie, AB)
Product:
8" - 24" pipe
2648 Meters Pulled, Multiple Road and Hotline Crossings
Surerus Pipeline
Project:
Fortis BC IGU Mackenzie Loop
Product:
6" Steel, 450m and 500m Creek and Wetland Crossings
Mastec Canada
Project:
ConocoPhillips - Cameron River HDD
Product:
4" and 16" Steel Parallel 800m (+30m deep) Cameron River Crossings
Municipal | Utility | Infrastructure
Mastec Canada
Project:
Alta Gas – Fibre
Product:
2” Fibre through 7” pilot hole
5591 Meters Pulled, longest 675m
Crossing types varied
Eh-Cho-Dene
Project:
Fort Nelson Airport Water Main Connector
Product:
6” & 10” HDPE
9370 Meters of 6” Pulled (longest crossing 578m), 1108 Meters of 10” (longest crossing 398m)
Crossing types varied
Pacific Northern Gas
Project:
Fort St John Gas Utility and Maintenance Contract 2020-current
Product:
Dresser Removals/Replacements, Live Valve Installations, Line Replacements 2"-6" HDPE
Project:
6" PE Distribution Line, Dawson Creek, BC to Pouce Coupe, BC
Product:
6" HDPE
6,955 Meters Pulled. Multiple Road and Hotline Crossings.
close lightbox