Auger Bore / DTH / Pipe Ram Services


Macro Projects

Project: Trans Mountain Expansion Project
Product: 36"-48" pipe, 700m+ installed
ABM and DTH installation methods

ConocoPhillips

Project: Cameron River Crossing Project
Product: 12", 16" and 24" Conductor Barrels
Installation with Pipe Ram/ABM

S. Young Enterprises 

Project: Capital Roadworks 2020 Project
Product: Guided 30" Casing install
Installation with Air Hammer/Pipe Ram

HDD Services


Strike Energy Group

Project: Husky Oil Operations Ltd. Grande Prairie, AB (14-28-62-06 W6)
Product: 6” YJ2K 
361m (First 300m solid rock) Double Creek Crossing

Pembina Pipeline

Project: Encana North Central Liquids Hub ( Farmington, BC)
Product: 10” Steel
1644 Meters Pulled, Lengths Vary, Crossing Types Varied
Two Designed Crossings, 248m Road and 249m Wetland

Project: NPS 10 Swan Hills Replacement Pipeline (Swan Hills, AB)
Product: 10” Steel
813m (+30m deep) Creek and Hotline Crossing
357m (+30m deep)  Freeman River Crossing

Project: Canbriam Nevis Expansion (Wonowon, BC)
Product: 6” Steel
414m (+30m deep)  Cameron River Crossing

Black Swan Energy

Project: North Aitken C-38-C (Tommy Lakes area, BC)
Product: 6", 12", 16" pipe
1637 Meters Pulled. Designed Creek Crossings.

Tourmaline


Project: Sundance Field Pipeline Project
Product: 6" Steel Multiple Creek Crossing, 200-400m

Project: Cameron River Project
Product: 12" Steel Parallel 500m River Crossing

Project: Gundy Gas Plant (North of Fort St. John, BC)
Product: 8" YJ2K and 20" FBE
1989 Meters Pulled. Extreme hard ground conditions.

Macro

Project: Spectra – Dead Horse Creek (Kobes, BC)
Product: 12” YJ320m (+30m deep) Creek Crossing
320m (+30m deep) Creek Crossing

Project: Seven Generations Nest 3 Project (South of Grande Prairie, AB)
Product: 8" - 24" pipe
2648 Meters Pulled, Multiple Road and Hotline Crossings

Surerus Pipeline

Project: Fortis BC IGU Mackenzie Loop
Product: 6" Steel, 450m and 500m Creek and Wetland Crossings

Mastec Canada

Project: ConocoPhillips - Cameron River HDD
Product: 4" and 16" Steel Parallel 800m (+30m deep) Cameron River Crossings


Municipal | Utility | Infrastructure

Mastec Canada

Project: Alta Gas – Fibre
Product: 2” Fibre through 7” pilot hole
5591 Meters Pulled, longest 675m
Crossing types varied 

Eh-Cho-Dene

Project: Fort Nelson Airport Water Main Connector
Product: 6” & 10” HDPE
9370 Meters of 6” Pulled (longest crossing 578m), 1108 Meters of 10” (longest crossing 398m)
Crossing types varied

Pacific Northern Gas

Project: Fort St John Gas Utility and Maintenance Contract 2020-current
Product: Dresser Removals/Replacements, Live Valve Installations, Line Replacements 2"-6" HDPE


Project: 6" PE Distribution Line, Dawson Creek, BC to Pouce Coupe, BC
Product: 6" HDPE
6,955 Meters Pulled. Multiple Road and Hotline Crossings.

Column


External link opens in new tab or window+1 (250) 785-8380


Column


External link opens in new tab or windowoffice@cabre.ca


Column


8611 Northern Lights Dr.,

Fort St.John, BC

V1J 0B4


close lightbox